Nuclear Power Plant Decommissioning


Plant:
Project:
Unit:
Location:
Owner:
Contractor:
Year:

Humboldt Bay Nuclear Power Plant
Vent Stack Removal
Unit #3
Eureka, CA
Pacific Gas & Electric Co.
Burns & Roe
1999









Scope:

Bigge Power Constructors, as subcontractor to Burns & Roe, performed the following nuclear power plant decommissioning work involving heavy lift and heavy transportation.

  • Engineered solutions for the vent stack removal
  • Supplied a 450 ton capacity crane to remove stack sections
  • Engineered “fall path” solutions for nuclear project safety requirements
  • Removed and transported stack section to decontamination area

Job Challenges:

Bigge Constructors will successfully deal with the following challenges on this project.

  • Rigging and lifting vent stack sections 300’ above grade and located
  • Providing engineered fall path protection for the Containment structure and spent Fuel Pool
  • Addressed seismic and ground bearing issues related to the location of the 450 ton crane
Bigge Power Constructors
Revised September 22, 2004