Nuclear Steam Generator Replacement


Plant:
Project:
Unit:
Location:
Owner:
Year:

McGuire Nuclear Generating Station

Unit #1 and #2
Hunterville, NC
Duke Energy Corporation
1996-1997









Scope:

Bigge Power Constructors, as subcontractor to Duke, performed the following nuclear steam generator (SG) work involving heavy lift and heavy transportation.

  • Engineered solutions to the SG lifts and transport
  • Installed specialized Bigge SG handling equipment in the McGuire Containments
  • Lifted and removed four existing 425-ton Unit #1 SG’s from Containment
  • Lifted and removed four existing 425-ton Unit #2 SG’s from Containment
  • Moved into Containment, lifted and set the four SG’s in each Unit #1 and #2
  • Transported original SG’s to onsite entombment by platform trailer

Job Challenges:

Bigge Power Constructors successfully dealt with the following challenges on this project.

  • Handling of eight original and eight replacement SG’s, a total of 6,800 tons
  • Engineering unique solutions including a down-ending cart and a runway through the ground level equipment hatch
  • Utilized a Temporary Lifting Device on top of the Containment Polar Crane
  • Transportation of SG’s by platform trailer
Bigge Power Constructors
Revised March 10, 2005

  Download PDF