Nuclear Steam Generator Replacement


Plant:
Project:
Unit:
Location:
Owner:
Year:

Rancho Seco Nuclear Power Plant
Steam Generator Removal Support
Single Unit Plant
Herald, CA
Sacramento Municipal Utility District
2004-2005









Scope:

Bigge Power Constructors, as subcontractor to SMUD, performed the following nuclear steam system decommissioning work involving heavy lift and heavy transportation.

  • Engineered solutions to lifts of the Steam Generators (SG’s)
  • Installed specialized Bigge SG lifting equipment in Containment
  • Lift and holding the two 560-ton SG’s for segmenting into halves
  • Removal of SG halves from Containment
  • Transportation of SG halves by platform trailer to on-site storage

Job Challenges:

Bigge Constructors successfully dealt with the following challenges on this project.

  • Handling of two SG’s, a total of 1,120 tons
  • Engineering unique solution for SG removal utilizing specialized equipment for lifting and rigging
  • Managed all site field forces and general engineering personnel through four year contract to complete the decommissioning process
  • Previously removed the generator rotor and transported it by land and water to the Surry Nuclear Power Plant in Virginia
Bigge Power Constructors
Revised March 10, 2005