Nuclear Steam Generator Replacement


Plant:
Project:
Unit:
Location:
Owner:
Contractor:
Schedule:

Seabrook Nuclear Station
Steam Generator Replacement Project
Unit #2
Seabrook, NH
North Atlantic Energy Corporation
Raytheon Engineers & Constructors, Inc.
1996









Scope:

Bigge Power Constructors, as subcontractor to Raytheon, performed the following nuclear steam generator (SG) work involving heavy lift and heavy transportation.

  • Engineering solutions to the SG lifts and transport
  • Installed specialized Bigge SG handling equipment in the Seabrook Containment
  • Lifted and removed four 375-ton Seabrook SG’s from Containment
  • Transported Seabrook SG’s by barge and platform trailer to Salem, NJ
  • Moved replacement SG’s into Salem Containment, lifted and set

Job Challenges:

Bigge Power Constructors successfully dealt with the following challenges on this project.

  • Simultaneous operations at two nuclear power plant facilities under tight schedules
  • Handling eights SG’s, a total of 3,000 tons
  • Engineering unique solutions including a down-ending cart and a runway through the ground level equipment hatch
  • Utilizing plant cranes for lifting SG’s (Temporary Lifting Device was used)
  • Transportation of SG’s by platform trailer and barge
  • Highway bridges of insufficient capacity requiring reinforcement and jumping
  • Barge transportation, requiring two barge / tug units, handled by Bigge