Nuclear Power Plant New Construction
Plant:
Project:
Unit:
Location:
Owner:
Contractor:
Year:
South Texas Project Unit 1 and 2
Large Component Transport and Lifting
Unit #1 and #2
Bay City, Texas
NRG Energy, CPS Energy, Austin Energy
Brown & Root
1978
Scope:
Bigge as subcontractor to Brown & Root / Ebasco performed the following nuclear power plant steam system new plant construction work involving heavy lift and heavy transportation. Bigge handled the steam turbine generator and reactor pressure vessel internals.
- Engineered unique solutions to the lifts and transportation
- Using gantry lifted the steam turbine generator from barges at Site barge slip
- Trans-loaded to Bigge crawler transporters for on site travel
- Using gantry set the generator on the turbine pedestal deck
Job Challenges:
Bigge Constructors successfully dealt with the following challenges on this project.
- Handling of the steam turbine generators (410 tons)
- Engineering unique solution for the transportation of the components
- Furnishing specialized equipment for lifting and transportation
- Lifting solutions at barge slip and turbine pedestal