Ginna Nuclear Generating Station (495 MW)
Reactor Vessel Closure Head Replacement Project
Single Unit Plant
Ontario, NY
Rochester Gas & Electric
Framatome ANP
2002-2003









Scope:

Bigge Power Constructors, as subcontractor to Framatome ANP, performed the following nuclear reactor vessel head (RVH) replacement work involving heavy lift and heavy transportation.

  • Engineered and fabricated a lifting and skidding device to move the RV head with the CRDM’s attached
  • Removed the existing RVH
  • Installed specialized Bigge handing equipment in Containment including a though-hatch runway system for the ground-level equipment hatch
  • Transported RVH and CRDM assembly on platform trailers
  • Moved into Containment, rotated, lifted and set the approximately 150 ton replacement RVH assembly

Job Challenges:

Bigge Constructors successfully dealt with the following challenges on this project.

  • Engineering unique solution to RVH with CRDM’s attached
  • Device designed to hold CRDM’s in place during rotation and to handle assembly with tight clearances (1”) to the Containment equipment hatch
  • Handling, skidding and rotating RVH with CRDM’s attached