Nuclear Reactor Vessel Head Replacement


Plant:
Project:
Unit:
Location:
Owner:
Contractor:
Year:

Palo Verde (1,200 MW)
Reactor Vessel Closure Head Replacement
Unit #1, #2, and #3
Palo Verde, AZ
APS (Arizona Public Service)
APS
2009-2010









Scope:

Bigge Power Constructors, as subcontractor to APS, will perform the following nuclear reactor vessel head (RVH) replacement work involving heavy lift and heavy transportation.

  • Engineer and fabricate lifting devices to lift and rotate the RV heads while holding the CRDM’s
  • Engineer and install a specialized Bigge elevated, through-hatch runway system needed to handle the RV heads to the elevated Containment equipment hatch
  • Install Bigge’s specialized cantilever RV head handling system which copes with tight hatch clearances and interior floors lacking load bearing capacity
  • Transport RVH /CRDM assembly on platform trailers
  • Remove the existing RV head from Containment
  • Move into Containment, rotate, lift and set the new RV head assembly

Job Challenges:

Bigge Constructors will successfully deal with the following challenges on this project.

  • Engineer unique solution for RV head exchanges to elevated Containment hatch with tight clearances to the RV head