Nuclear Reactor Vessel Head Replacement
Plant:
Project:
Location:
Owner:
Contractor:
Year:
Point Beach Unit #2 (519 MW)
Reactor Vessel Closure Head Replacement Projects
Two Rivers, WI
Nuclear Management Co.
Westinghouse Electric Co.
2005 (April)
Scope:
Bigge Power Constructors, as subcontractor to Westinghouse, performed the following nuclear reactor vessel head (RVH) replacement work involving heavy lift and heavy transportation.
- Engineered custom solutions for the plant’s head and Containment circumstances
- Fabricated lifting and skidding devices and runways to move the RVH heads
- Ensured devices account for RVH with CRDM’s attached
- Ensured devices account for tight clearances through equipment hatches (min. 2”)
- Received new MHI RVH, stored, moved, upended and disassembled container
- Installed specialized Bigge handling equipment in Containment including a through-hatch runway system
- Removed the existing RVH from Containmen
- Moved into Containment, upended, lifted and set replacement RVH with CRDM’s attached
- Moved Duratek transportation container into Auxiliary Bldg, upended, and placed on RVH
- Transported RVH in Duratek container and trans-loaded for road travel to disposal
Job Challenges:
Bigge Constructors successfully dealt with the following challenges on this project.
- Engineering unique solution to RVH accounting for CRDM’s, tight clearances and the at-grade equipment hatch access
- Handling, skidding and rotating the RVH’s with CRDM’s attached
- Handling and lifting RVH’s with CRDM’s attached, approximately 150 tons
- Beating the critical path schedule while achieving low dose and safety
Bigge Power Constructors
Revised July 18, 2005