Nuclear Reactor Vessel Head Replacement


Plant:
Project:
Unit:
Location:
Owner:
Contractor:
Year:

Three Mile Island Nuclear Generating Station (814 MW)
Reactor Vessel Closure Head Replacement Project
Unit #1
Londonderry Twp, PA
GPU Nuclear
Framatome ANP
2002-2003









Scope:

Bigge Power Constructors, as subcontractor to Framatome ANP, performed the following nuclear reactor vessel head (RVH) replacement work involving heavy lift and heavy transportation.

  • Engineered and fabricated a lifting and skidding device to move the RV head
  • Removed the existing TMI RVH
  • Handled the RVH with tight clearances to the Containment equipment hatch
  • Installed specialized Bigge lifting equipment in Containment
  • Moved into Containment and set the approximately 100 ton replacement TMI RVH

Job Challenges:

Bigge Constructors successfully dealt with the following challenges on this project.

  • Engineering unique solution for this bare (without CRDM’s) RVH replacement
  • Containment hatch opening only allowed tight clearances to the RV head
Bigge Power Constructors
Revised November 14, 2005