  

##  Bigge was building and scaling datacenter infrastructure before the internet exploded onto the scene in the 1990s. 

Upgrading or constructing new data centers for large computer networks and servers can be a large-scale operation that requires heavy lifting and transport assistance. Bigge has the best selection of rough terrain, crawler cranes, all terrains, and truck cranes available for rent around the nation. In Northern California, we offer full-service rentals. We professionally maintain our crane fleet to bring our customers the best value so you can be confident your data center is built by the best in the business.

### Datacenter Infrastructure Crane Specialists

For complex lifting needs, datacenter infrastructure construction requires precise planning, experience, and attention to detail. Bigge’s Perfect Fleet® offers a large selection of crawler cranes like the Manitowoc MLC650 and mobile cranes like the Liebherr LTM1200 and LTM1400. The LTM1400 seven-axle crane is the most compact and maneuverable in its class. It has a maximum lift capacity of 500 tons, a full telescoping boom length of 197 feet, and a lattice jib extension of up to 276 feet.

Many datacenter projects require more than just heavy lifting. We also provide transportation and storage of materials and equipment and expert rigging crews that provide jack and roll services for moving data center equipment in hard to reach spots.

### Datacenter Construction Equipment For Rent

- [ Crawler Cranes ](/crane-rental/crawler-cranes/)
- [ All-Terrain Cranes ](/crane-rental/all-terrain-cranes/)
- [ Truck Cranes ](/crane-rental/truck-cranes/)

- [ Crawler Cranes ](/crane-rental/crawler-cranes/)

- [ All-Terrain Cranes ](/crane-rental/all-terrain-cranes/)

- [ Truck Cranes ](/crane-rental/truck-cranes/)

## Complete Datacenter Construction Crane Rental Solutions

No other crane company will compare to Bigge when it comes to the support you get - our project managers are available to assist in all phases of the job from pre-construction to delivery. We work hard to eliminate downtime by maintaining a network of spare parts and factory-trained technicians throughout the country.

[ Request a Quote ](#) 

### We Are the Trusted crane Partner for These Industries:

- [ Wind Turbine ](https://www.bigge.com/industries-served/wind-turbine-erection-and-maintenance/)
- [ Civil Infrastructure ](https://www.bigge.com/industries-served/civil-infrastructure/)
- [ Accessory Dwelling Units ](https://www.bigge.com/industries-served/accessory-dwelling-units/)
- [ Industrial Construction ](https://www.bigge.com/industries-served/industrial-construction/)
- [ HVAC ](https://www.bigge.com/industries-served/hvac-installation-and-replacement/)
- [ Modular Building ](https://www.bigge.com/industries-served/modular-building/)
- [ Steel Erection ](https://www.bigge.com/industries-served/steel-erection/)

- [ Bridge Construction ](https://www.bigge.com/industries-served/bridge-construction/)
- [ Education Infrastructure ](https://www.bigge.com/industries-served/education-infrastructure/)
- [ Shipyards & Ports ](https://www.bigge.com/industries-served/shipyards-and-port-construction/)
- [ Biotech ](https://www.bigge.com/industries-served/biotech-construction/)
- [ Refinery & Petrochemical ](https://www.bigge.com/industries-served/refinery-and-petrochemical/)
- [ Commercial Construction ](https://www.bigge.com/industries-served/commercial-construction/)
- [ Datacenter Construction ](https://www.bigge.com/industries-served/datacenter-construction/)

- [ Residential & Mixed-Use ](https://www.bigge.com/industries-served/residential-and-mixed-use-construction/)
- [ Tilt Up Construction ](https://www.bigge.com/industries-served/tilt-up-construction/)
- [ Wireline ](https://www.bigge.com/industries-served/wireline/)
- [ Hospital Infrastructure ](https://www.bigge.com/industries-served/hospital-infrastructure/)
- [ Emergency Recovery ](https://www.bigge.com/industries-served/emergency-crane-service/)
- [ Pile Driving ](https://www.bigge.com/industries-served/piledriving/)
- [ Telecommunications ](https://www.bigge.com/industries-served/telecommunications-crane-rental/)

## Highlights of our nationwide fleet:

Bigge has a specialized fleet of crawler and rough terrain cranes dedicated to wind turbine erection. All crawlers are available for bare rental nationwide out of any of our 20 locations coast to coast, and operated and maintained crane rental service in the western United States. Bigge also supports wind power contractors by offering a full engineering design service, complete with Auto CAD drawings, for lift planning and transportation operations.

<a class="px-4 py-8 w-full bg-white rounded-md"> #### Safety

We value safety above all else and believe good judgment is essential to our success.

</a> <a class="px-4 py-8 w-full bg-white rounded-md"> #### Teamwork

We are One Bigge.

</a> <a class="px-4 py-8 w-full bg-white rounded-md"> #### Innovation

We embrace agility, empowerment and ongoing improvement.

</a> <a class="px-4 py-8 w-full bg-white rounded-md"> #### Results

We are accountable to our customers, ourselves and eachother.

</a> <a class="px-4 py-8 w-full bg-white rounded-md"> #### Passion

We love this business and are committed to bringing the perfect fleet to the industry.

</a>